Charles George VA Medical Center

Replace Pneumatic Controls with Direct Digital Controls


Asheville, NC

$4,118,700 Estimated Construction Value

Approximately 675,000 square feet

Construction In Progress
  • The project objective was to remove as many old, leaking existing controls as possible and replace them with new reliable, energy efficient Direct Digital Controls (DDC’s).

 

  • DDC’s in 16 buildings were replaced, including inside the 600,000 square foot main hospital, and integrated into the campus-wide system.

 

  • An extensive onsite investigation and assessment was conducted to identify and document existing pneumatic control systems and their existing sequence of operation.