The replacement of two end of life 820KW generators. One new 1500kKW generator was specified to integrate with two recently installed Caterpillar generators. The controls for the two existing generators were refurbished so that they communicate with the new generator. The new generator was connected to the existing fuel delivery system.
Existing paralleling switchgear upgraded to incorporate the new generator
New controls cubicle added
Three outdated transfer switches replaced
Circuits adjusted to the proper branch of emergency power
The exhaust from the new generator was piped across the roof to the opposite side of the building to avoid contaminating the outside air intake for the operating room air handling unit.